disperso
Guest
Good evening to all,
I better explain the title: in April 2014 I had to change machine for a disk problem, fortunately I had an updated copy of all the designs in itself until the day before.
arrived the new ws, copy and paste and away... "remained" as they are, I do not realize that all the copied drawings take as the date of creation that of the copy, therefore also those at es of 2006 take as date for the cartiglio that of April 2014.
in the chart, in the given section, I have always used "%{created|r1}" which is the only instruction that has always given me the right date.
obviously for subsequent drawings, no problem.
How can I solve this?
Thank you very much.
I better explain the title: in April 2014 I had to change machine for a disk problem, fortunately I had an updated copy of all the designs in itself until the day before.
arrived the new ws, copy and paste and away... "remained" as they are, I do not realize that all the copied drawings take as the date of creation that of the copy, therefore also those at es of 2006 take as date for the cartiglio that of April 2014.
in the chart, in the given section, I have always used "%{created|r1}" which is the only instruction that has always given me the right date.
obviously for subsequent drawings, no problem.
How can I solve this?
Thank you very much.