Davimont
Guest
I immediately press that I am not an electrician but that I only have to make a maximum calculation to communicate in the first battura the absorptions present on the supply line of our plants.
I hypothesize a situation to make the idea better.
1 4kw three-phase electroventilator
15 neon lamps with 2 58watt tubes on each stage.
of course 5 poles 3p+n+t
do you recommend a formula to know how much the plug should be to install? Forgive me, but I'm not in the electric field.
I hypothesize a situation to make the idea better.
1 4kw three-phase electroventilator
15 neon lamps with 2 58watt tubes on each stage.
of course 5 poles 3p+n+t
do you recommend a formula to know how much the plug should be to install? Forgive me, but I'm not in the electric field.