Sergio68
Guest
Hello everyone
Since I didn't find a trace of a file like that on the net, I created it.
to calculate the developments of the folds to 90 degrees and open (for the closed folds I am working on), unfortunately excel with the radiants is not of help.in the first sheet (pieghe 90°)you will have the ability to change the k factor, in the second no, of default is set to 0.5.
I remind you that the rule is "v" of the quarry = 6-8 times the thickness ;-)
I hope it's useful to someone, and I hope I'm not wrong section. . .
p.s.
is very useful if you can not use other dedicated 3d software.
Sergio
Since I didn't find a trace of a file like that on the net, I created it.
to calculate the developments of the folds to 90 degrees and open (for the closed folds I am working on), unfortunately excel with the radiants is not of help.in the first sheet (pieghe 90°)you will have the ability to change the k factor, in the second no, of default is set to 0.5.
I remind you that the rule is "v" of the quarry = 6-8 times the thickness ;-)
I hope it's useful to someone, and I hope I'm not wrong section. . .
p.s.
is very useful if you can not use other dedicated 3d software.
Sergio