Joel
Guest
Hello.
I recently made a 2d design, and after a change of 3d, the 2d shares did not update but lost the link (i.e. the odds became "pink"). Of course I have reconnected quotas for quotas (they are not many), but I wanted to understand if there is a method to reconnect all quotas, without losing too much time, or if there are procedures to save or manage files in order to avoid this problem.
Thank you.
I recently made a 2d design, and after a change of 3d, the 2d shares did not update but lost the link (i.e. the odds became "pink"). Of course I have reconnected quotas for quotas (they are not many), but I wanted to understand if there is a method to reconnect all quotas, without losing too much time, or if there are procedures to save or manage files in order to avoid this problem.
Thank you.