Fulvio Romano
Guest
easy domandina.
I have in the house a plant with arrival line -> general magnetothermic -> two differentials (befores and lights) -> magnetothermic of the users.
I would like to install a load manager (a f80gc for accuracy), install it downstream of the general, before the two differentials. What about the system's conformity certificate?
and if in addition to this installation of the smaller interior cables? I'm putting 2.5mm2 against 4mm2 of the rest of the picture.
Thank you.
I have in the house a plant with arrival line -> general magnetothermic -> two differentials (befores and lights) -> magnetothermic of the users.
I would like to install a load manager (a f80gc for accuracy), install it downstream of the general, before the two differentials. What about the system's conformity certificate?
and if in addition to this installation of the smaller interior cables? I'm putting 2.5mm2 against 4mm2 of the rest of the picture.
Thank you.