Kattivo83
Guest
the point is this: in the design phase the operator must have the focus on the project, not on the software. now vien from if that at the time of changing a software, the attention moves on the software to look for those functions that you knew before they were without thinking about it. Anyway, by past experience (years 2012 - 2104) we worked shoulder to shoulder I with zw3d and a former colleague with summittron e10. I only tell you that after finishing drawing I had to wait for him because I still calculated the drilling cycles. Then it's up to you to decide.